Project diagnosis
Engineers review outage risk and critical loads
The review starts with the facility type, critical loads, outage scenarios, ATS transfer, operating hours, existing equipment condition and local maintenance capability.
HOHANK value proposition
HOHANK brings generator sets, power distribution and control, spare parts and engineering support together to deliver stable, safe and maintainable backup power for hospitals, shopping centers, factories, hotels, educational facilities and data centers.
HOHANK service commitment
Since 2012, HOHANK has supported commercial buildings, industrial sites and critical facilities. This engineering experience covers outage transfer, fire systems, elevators, cold chains, production lines, UPS backup, noise, installation space, fuel autonomy and after-sales response.
Project diagnosis
The review starts with the facility type, critical loads, outage scenarios, ATS transfer, operating hours, existing equipment condition and local maintenance capability.
Clearly defined scope
Before purchase, HOHANK engineers review generator capacity, ATS, paralleling, low-voltage distribution, fuel autonomy, remote monitoring, spare parts and expansion allowance as one system. That keeps the decision from being reduced to the price of a single machine.
Quality and after-sales
Factory testing, site connection, commissioning, operator training, spare-parts supply and fault response are included in the project requirements to reduce risk after delivery.
Why work with HOHANK
For commercial and critical projects, HOHANK coordinates diesel generator sets, ATS, paralleling systems, low-voltage distribution, fuel autonomy, remote monitoring, spare parts and engineering support across selection, supply and delivery.

Engines and alternators
The engineering team matches the engine and alternator to critical loads, starting current, operating hours, acoustic requirements and budget.

Distribution, ATS and control
The engineering team integrates ATS, paralleling controls, low-voltage distribution, protection and controllers into the same power system.

Spare parts and maintenance consumables
Engineers plan critical consumables and electrical components in advance to reduce diagnosis and recovery time after an interruption.

Engineering capabilities
The engineering review turns site conditions, critical loads, starting method, distribution scope and support requirements into an executable project plan.
HOHANK service process
The customer shares the country, city, facility type, outage pattern, critical loads, existing equipment condition or upgrade plan. Those facts define the direction of the review.
Engineers review ICUs, operating rooms, fire and security systems, elevators, cold chains, PLCs, UPS systems, cooling, operating hours and starting sequence to prioritize the loads.
The configuration covers the generator set, ATS, paralleling, low-voltage distribution, fuel autonomy, remote monitoring, spare parts and expansion allowance.
Engineers match Weichai, Cummins or Yuchai engines with suitable alternators, controllers, ATS and critical electrical components according to the budget, loads and operating profile.
The project team coordinates manufacturing, testing, shipping documents, installation conditions and connection requirements to reduce problems when the equipment arrives.
After delivery, service engineers support commissioning, training, diagnostics, maintenance and spare parts through a clear response path.
Engineering Support
Share the country, city, facility type, critical loads, current power issue and operating hours. An engineer will review capacity, redundancy, paralleling, ATS, distribution, fuel autonomy, monitoring and spare parts.
Share the basic project details and an engineer will help define the next step.